Curve 45 Channel

Technical Details

Model Number:

DLTC-S-CURVE45

pa_accessory

34

Channel Inner Width

14.1mm

Channel Outer Width

18.4mm

Channel Outer Depth

18.4mm

Mounting

Recessed

Curve 45 Cut Sheet
Description

Curved LED Channel

 

The Finishing Touch That Makes It All Look Intentional

A Curved LED Channel isn’t just a mount — it’s what takes your LED tape project from “bright” to brilliant. Think of it as the architectural frame around your light story: sleek, protective, and precision-built to elevate the final look.

Whether you’re recessing into drywall, surfacing along cabinetry, or creating custom pendants, our LED channels deliver that clean, professional finish that clients actually notice. Pair them with opal or frosted lenses to eliminate hot spots, or go clear for pure punch.

Why Designers & Installers Love It:

  • Clean Lines, Clean Look: No sagging strips, no glue failures — just perfection
  • Built to Blend or Stand Out: Surface, recessed, corner, pendant — your canvas, your call
  • Diffuser Options: Opal, clear, or black-out lenses to control brightness and aesthetics
  • Thermal Management: Helps LEDs run cooler, brighter, and longer
  • Custom Cuttable: Field-trimmable to any project length with accessories to match

It’s not just a channel — it’s the detail that seals the deal.

Elevate your light. Frame your brilliance.

Additional information
Model Number:

DLTC-S-CURVE45

pa_accessory

34

Channel Inner Width

14.1mm

Channel Outer Width

18.4mm

Channel Outer Depth

18.4mm

Mounting

Recessed

Certifications
Gallery

There are no Images right now

Line Drawings

Related Products